Sky
Harbor Airport - As part of
the Ames Construction Team,
Oridian is providing quality
control program management and
inspection for the Taxiway C
West Infill project. The work
includes PCCP and asphalt paving
as well as new taxiway lighting
and signage
|
|
 |
Gateway
Airport - Oridian is providing
construction inspection services
on the site work for the expansion
of the West Passenger Terminal.
The work is both air-side and
land-side.
|
|
 |
Avondale
- Oridian is the construction
manager for the equipping of
two new municipal water wells
in the City of Avondale. The
work will include water treatment
facilities.
|
|
|
|
Phoenix
- Oridian has been selected
to provide construction management
and inspection services, as
part of the Dibble Team, for
the Lincoln Drive water main
project. This job includes the
installation of new large diameter
piping from the 24th Street
water treatment plant to a reservoir
at 36th Street. Hard rock excavation
is involved.
|
|
|
|
Bureau of Reclamation - As a
subconsultant to Ames Construction,
Oridian is the quality control
program manager for the Drop
2 Reservoir project in southern
California. This project includes
construction of by-pass canals,
a very large lined reservoir,
and by-pass structures associated
with the All American Canal.
|